MA+KE Project Process
Taking a project through a proven creative process can increase the level of success and reduce the level of stress. The best process uses steps that build on the previous steps. We have developed a 3 part process that keeps the project on track while providing the opportunity for collaboration and creativity.
Part I
Discovery: We gather all the background information about your vision, the site and regulatory constraints before we begin any design work
Exploration: Based on the information gathered in Discovery, design concepts are developed for your review and comment. Based on the comments received, a final design is developed for your approval.
Reality Check: The final schematic design is put through a “constructability review”, which includes an initial construction cost estimate and construction schedule. This allows you to make informed decisions about the final scope of the project and determine a reasonable budget.
Once you approve the project scope and budget, we move to Part II
Part II
Design Refinement: We refine the project design. These design refinements are used to update the construction cost estimate and ensure that your project is staying on track.
Details: We complete the detailed drawings and specifications that set forth the requirements for construction of the project.
Approvals: We prepare the application for the building permit and submit it to the town for approval. We also issue the detailed drawings and specifications to your Construction Manager for final pricing of your project.
Part III
Construction: During this period we monitor the construction progress and answer design questions from the Construction Manager.
Move In: When the project is almost complete we coordinate with the Construction Manager to make sure that everything is completed and ready for you to move in.
Follow Up: After you have lived in the project for approximately 9 months, we schedule a follow up review and inspection to get your feedback on what it is like to live in the home as well as to create a list of items that the Construction Manager should address prior to the end of the 1 year warranty period.
Download your PDF copy of the MA+KE Architects Design Process.